Sidewalk Gaps
Project Contact: Max Baker
Max.Baker@franklintn.gov
615-550-6661


Phases
Phases overview
Phase 1: Identify Sidewalk Gaps
Identify Sidewalk Gaps
Identify Sidewalk Gaps
October 9, 2026 5:00 AM - November 30, 2026 5:59 AM
Please indicate where you would like to see a sidewalk gap completed by dropping a pin on the map or using the "submit your idea" link above. If the gap has already been identified, please give it a thumbs up.
When filling out the location information, please select if the sidewalk gap is located in either category:
- Neighborhood: gap is located within a neighborhood or subdivision
- Major roadway: gap is located along a public roadway that is not in a neighborhood or subdivision
- Trail or pathway: gap is located in an area that could be in or next to a park, school, campus, or public open space

