Skip to main content

Sidewalk Gaps

Project Contact: Max Baker

Max.Baker@franklintn.gov

615-550-6661

Phases

Phases overview
Phase 1: Identify Sidewalk Gaps
Identify Sidewalk Gaps

Identify Sidewalk Gaps

October 9, 2026 5:00 AM - November 30, 2026 5:59 AM

Please indicate where you would like to see a sidewalk gap completed by dropping a pin on the map or using the "submit your idea" link above. If the gap has already been identified, please give it a thumbs up.

When filling out the location information, please select if the sidewalk gap is located in either category:

  1. Neighborhood: gap is located within a neighborhood or subdivision
  2. Major roadway: gap is located along a public roadway that is not in a neighborhood or subdivision
  3. Trail or pathway: gap is located in an area that could be in or next to a park, school, campus, or public open space

36 ideas